YORG.io Wiki
Tag: Visual edit
Line 6: Line 6:
 
*Make sure to upgrade this often to get better [[Crystal Mine]]s.
 
*Make sure to upgrade this often to get better [[Crystal Mine]]s.
 
*You may not need to build [[Cannon Tower]]s in the first 1-2 nights as it deals a considerable amount of damage at that stage.
 
*You may not need to build [[Cannon Tower]]s in the first 1-2 nights as it deals a considerable amount of damage at that stage.
*When upgraded, allows access to new and more buildings. However, you do not need to place everything down when you unlock it.
+
*When upgraded, allows access to new and more buildings. However, you do not need to immediately place everything down when you unlock it.
   
 
== Number of buildings at different base levels ==
 
== Number of buildings at different base levels ==

Revision as of 20:56, 2 May 2018

Your Base - Protect it, once destroyed the game is lost.

Tips

  • This is your most important building. Protect it at all costs.
  • Put Walls directly around it for a little defense if any Dread Lords breakthrough.
  • Make sure to upgrade this often to get better Crystal Mines.
  • You may not need to build Cannon Towers in the first 1-2 nights as it deals a considerable amount of damage at that stage.
  • When upgraded, allows access to new and more buildings. However, you do not need to immediately place everything down when you unlock it.

Number of buildings at different base levels

Base level 1 2 3 4 5 6 7
Wall 20 40 80 100 120 140 150
Transporter 10 15 20 25 30 45 50
Crystal Mine 2 4 6 8 10 12 16
Iron Mine 2 4 8 10 12 16 18
Cannon Ball Factory 1 1 2 3 3 4 4
Cannon Tower 2 4 8 10 12 14 16
Harvester 0 3 6 6 9 12 15
Steel Factory 0 1 2 2 3 4 5
Sawmill 0 1 2 2 3 4 5
Arrow Factory 0 1 2 2 3 4 5
Arrow Tower 0 4 8 12 16 20 25
Uranium Mine 0 0 0 0 1 2 3
Nuclear Reactor 0 0 0 0 1 2 3
Lightning Tower 0 0 0 0 3 6 9

Characteristics at different levels

Level 1 2 3 4 5 6 7
Health 1 000 2 000 3 000 5 000 10 000 20 000 40 000
Damage 50 100 200 300 500 1 000 1 000
Upgrade 850 2 000 7 500 25 000 75 000 200 000 -
Cost 0 850 2 850 10 000 35 000 110 000 310 000

[1] initial reference